Adrem has developed for the beneficiary NURVIL, in Mihăesti commune, Stupărei village, a 2.7 MW photovoltaic power plant, designed for the production of electricity and its delivery to the distribution network.
Within this project, Adrem acted as the general contractor, delivering the complete solution, from design and engineering to execution, electrical integration, testing and commissioning. The plant is built on a ground-mounted structure and integrates 4,388 645 Wp monocrystalline photovoltaic panels, along with 8 330 kW inverters, configured to ensure high efficiency and stable operation over time.
Beyond the main components, the project includes all the elements necessary for safe and efficient operation: complete DC and AC electrical infrastructure, protection and grounding systems, perimeter lighting, security and an advanced monitoring and control system, which allows real-time monitoring of the plant’s performance.
According to the technical parameters, the plant generates approximately 3,816 MWh of electricity annually, with a capacity factor of over 16%.
The impact is concrete and measurable. The energy produced annually is equivalent to the specific consumption of medium-sized industrial or commercial operations and contributes to reducing emissions by approximately 2,300 tons of CO₂ per year.
During the reference period of the investment, the plant will produce over 76,000 MWh of green energy, strengthening its role as an efficient solution for optimizing energy consumption.