{"id":11259,"date":"2015-01-27T15:26:00","date_gmt":"2015-01-27T13:26:00","guid":{"rendered":"https:\/\/test.adrem.ro\/consumer-comfort-is-a-priority-for-cez-distributie\/"},"modified":"2026-08-31T16:33:30","modified_gmt":"2026-08-31T14:33:30","slug":"consumer-comfort-is-a-priority-for-cez-distributie","status":"publish","type":"post","link":"https:\/\/test.adrem.ro\/en\/consumer-comfort-is-a-priority-for-cez-distributie\/","title":{"rendered":"Consumer comfort is a priority for CEZ Distribu\u021bie"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Removing meters at the property limit and securing them means more safety and comfort for electricity consumers.<\/p>\n\n<p class=\"wp-block-paragraph\">The main benefits of consumers are:<\/p>\n\n<p class=\"wp-block-paragraph\">Making periodic readings without the need to contact and be present with the consumer.<\/p>\n\n<p class=\"wp-block-paragraph\">The execution of maintenance works on the connection installation or the updating of technical data can also be done without the need to contact or the presence of the consumer.<\/p>\n\n<p class=\"wp-block-paragraph\">Improving the quality of the distributed electricity, the works of removing meters at the property limit being correlated with the modernization works of the low voltage distribution network in the respective area.<\/p>\n\n<p class=\"wp-block-paragraph\">Moving the meter to the property limit involves the modification of the connection installation to the electricity network. The value of the work depends on the length and type of connection and is fully borne by the distribution operator within the planned modernizations. If the consumer individually requests the modification of the connection installation, the costs of the modification will be borne by him.  <\/p>\n\n<p class=\"wp-block-paragraph\">We mention that starting with 2012, the technical solutions for connecting the new consumers to the electricity network are made considering the location of the meter at the property limit.<\/p>\n\n<p class=\"wp-block-paragraph\">Since 2009, CEZ Distribu\u021bie has focused on removing the metering groups at the property limit. The value of the investment so far amounts to approximately 80 million lei. <\/p>\n\n<p class=\"wp-block-paragraph\">Of the total of 1.4 million meters installed in the Oltenia area, more than half are located outside the home or at the property limit. The works are prioritized according to the age and technical condition of the network as well as the quality parameters of the distributed electricity and gradually all subscribers in the Oltenia region will benefit from them. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Removing meters at the property limit and securing them means more safety and comfort for electricity consumers.<\/p>\n","protected":false},"author":3,"featured_media":11260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[73],"tags":[],"class_list":["post-11259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-releases"],"_links":{"self":[{"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/posts\/11259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/comments?post=11259"}],"version-history":[{"count":1,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/posts\/11259\/revisions"}],"predecessor-version":[{"id":11261,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/posts\/11259\/revisions\/11261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/media\/11260"}],"wp:attachment":[{"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/media?parent=11259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/categories?post=11259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/test.adrem.ro\/en\/wp-json\/wp\/v2\/tags?post=11259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}